ML evaluation backlog refinement¶
Linear issue: ML evaluation and telemetry implementation roadmap Objective: Refine every epic into clear implementation tasks using recommended defaults and current primary sources. Current state: All 37 epics have been refined into 77 implementation tasks in the Telemetry project on team PL. Linear remains authoritative.
Decisions¶
- The user's 2026-09-20 instruction authorizes recommended technical defaults and supersedes the earlier interview-only planning workflow.
- Selected designs and acceptance criteria live in each Linear epic/task. They are not claims of completed code, independent approval, or release qualification.
- Keep the dependency-free core, Consumer-owned meaning, bounded execution, payload-free evidence, and legacy report reading.
- Separate dataset identity from case-name alignment, candidate changes from evaluation-protocol changes, and repeated-run variability from population inference.
- Statistical threshold rules use an explicitly inclusive “at least” contract. Bootstrap family coverage remains approximate; corrected tails require sufficient resample resolution.
- Optional adapter installation infrastructure is a prerequisite; each feature owns its real adapter/device qualification, avoiding a circular support gate.
Changed files¶
docs/research/ml-evaluation-statistics-and-provenance.md: source-linked inference, metric, and identity research.docs/research/ml-inference-execution.md: source-linked timing, execution, resource, and serving recommendations.docs/research/ml-evaluation-integrations.md: source-linked telemetry, reporting, tracker, streaming, and LLM recommendations.- This handoff: verified tracker state and next action. No production source changed.
Verification¶
- Linear MCP: read original epic descriptions, comments, status, labels, project, and relations; created tasks and revised epic/map descriptions.
- Final full readback: 115 issues (one map, 37 epics, 77 tasks); zero audit errors for project, hierarchy, labels, task counts, primary-source references, acceptance/verification sections, or expected prerequisites.
- Dependency audit: 130 task-level and 88 epic-level native blocking relations; no cycles.
- Read-only repository inspection:
git status --short,cat,sed, andrg; inspected CONTEXT, agent conventions, evaluation implementation, public/safety/packaging specifications, and Make targets. git diff --check: passed before handoff creation; final whitespace check recorded in the session.- Red-state evidence: not applicable to backlog refinement. Test paths and Make commands in tickets are future implementation obligations, not tests already executed.
- Production tests, package builds, Docker checks, and GPU/provider qualification were not run because this session changed planning and research only.
Remaining work¶
- No remaining backlog-refinement work. All implementation work remains open in Linear.
- Do not close implementation epics merely because their refinement is complete.
Risks and constraints¶
- Exact installable optional versions and real hardware support must be established by their assigned tasks; primary documentation alone does not establish wheel/device compatibility.
- Confidence intervals require their declared sampling assumptions. KLL rank approximation is separate from population uncertainty.
- No raw inputs, outputs, case names, exception messages, secrets, or arbitrary serialized candidate objects may enter evidence artifacts.
Next action: Implement versioned dataset identity and backward-readable evaluation evidence; assessment outcome semantics and optional execution contracts are also unblocked.